Resumen
This document provides general requirements of Manufacturing Readiness Review (MRR), for space products, sometimes termed Production Readiness Review, including initiate process, implement process, conclude process and closed-loop process of MRR. The Manufacturing Readiness Review (MRR) is a formal examination to determine if the design (of product definition and requirements, manufacturing documentation, processes, personnel, materials and parts, facilities, etc.) is ready for production. Depending on the space system, the objectives of MRR could be performed through other existing reviews named differently and within the project/programme. The MRR could be repeated during the production phase. The typical programme milestone (phase ending) to operate MRR is detailed design stage during or at the end of development phase. The typical milestone criteria are the completion of production plan. This document is applicable to Manufacturing Readiness Review management.
Informaciones generales
-
Estado: En desarrollo
Puede contribuir al desarrollo del borrador de esta norma internacional. Para ello, contacte con su miembro nacional
Etapa: Voto sobre el DIS iniciado: 12 semanas [40.20] -
Edición: 1Número de páginas: 9
-
Comité Técnico :ISO/TC 20/SC 14ICS :49.140
- RSS actualizaciones