Résumé
Specifies rules for a certification scheme. Such a scheme for continuous production consists of the following stages: suitability testing, internal inspection by the manufacturer, inspection and supervision by an external body.
Informations générales
-
État actuel: PubliéeDate de publication: 1992-11Stade: Norme internationale confirmée [90.93]
-
Edition: 1Nombre de pages: 5
-
Comité technique :ISO/TC 17/SC 16
- RSS mises à jour