ISO/TR 21245-2:2016
w
ISO/TR 21245-2:2016
70251

Тезис

ISO/TR 21245-2:2016 aims to identify basic conditions of rail projects, which are essential input for the design of rail systems. This document does not interfere with existing national and local laws, legal requirements and regulations. It considers only the "planning stage" of rail projects and does not deal with the "execution stage". Any type of rail projects is intended to be dealt with, such as building a new line, retrofitting or upgrading of existing lines and change of operation or maintenance.

In ISO/TR 21245-2:2016, conditions are dealt with as premises or constraints, which can be difficult to adjust or change by stakeholders concerned in the project.


Общая информация 

  •  :  Withdrawn
     : 2016-11
  •  : 1
  •  : ISO/TC 269 Railway applications
  •  :
    45.020 Railway engineering in general

Жизненный цикл


Появились вопросы?

Ознакомьтесь с FAQ

Работа с клиентами
+41 22 749 08 88

Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)

Будьте в курсе актуальных новостей ИСО

Подписывайтесь на наши новости, обзоры, а также на информацию о продуктах.