IWA 33-3:2021
p
IWA 33-3:2021
82192

Abstract

 Preview

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.


General information 

  •  : Published
     : 2021-03
  •  : 1
     : 80
  •  : ISO/TMBG Technical Management Board - groups
  •  :
    27.140 Hydraulic energy engineering

Buy this standard

en
Format Language
std 1 187 PDF + ePub
std 2 187 Paper
  • CHF187

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)